Monday, 25 December 2017

BARRICADE PROCEDURES AND GUIDELINES


BARRICADES

A.    GENERAL

This procedure outlines the barricading requirements for Contractors to follow on the project. Barricade will generally not be accepted as the primary means of barricading off a hazard and may only be used as described within this procedure. Physical hard barriers will be used as the primary means to barricade hazards and hazardous work areas.

B.    PHYSICAL BARRIERS

Physical barriers will be erected to provide protection against hazards and dangers, hazardous work areas and hazardous work in all cases where the hazard or danger will exist for a period longer than 8 hours.

Barricade tape will be used to wrap around the physical barrier or in conjunction with the physical barrier to provide additional warning of the hazards or danger that exist and/or to increase the visibility of the barrier.

1)    Barriers will be constructed of material of substantial strength such as scaffold tubing or 50mm x 100mm lumber.

2)    Barricades shall be visible at all times where a hazard or danger exists and additional signs may also be required.


3)    All streets, roads, highways, and other public thoroughfares, construction roads which are closed to traffic, shall be protected by effective barricades on which shall be placed acceptable and highly visible warning signs. Barricades shall be located at the nearest intersecting, highway, street or road on each side of the blocked section.

4)    All floor openings, open trenches, and other excavations shall be provided with suitable floor opening covers, barriers, signs, and lights to the extent that adequate protection is provided to the employees and public. Obstructions such as material piles and equipment shall be provided with similar warning signs and lights.


5)    All barricades and obstructions shall be illuminated by means of warning lights from sunset to sunrise.

6)    Materials stored upon or alongside construction roads and public streets and highways shall be so placed, and the work at all times shall be so conducted as to cause the minimum obstruction and inconvenience to the traffic.


7)    All barricades, signs, lights and other protective devices shall be installed and maintained.

8)    Signs, signals, and barricades shall be removed when the hazard no longer exists.


C.     BARRICADE WARNING TAPE

Three (3) types of barricade tape will be utilized on this project as a visual warning for employees. Barricade tape does not offer physical protection for floor edges, roof edges, floor openings, trenches, excavations, etc., and shall not be used for physical protection. indicate the type of hazard that exists. Barricade tape may also be used to rope off low-risk hazards that will not take longer than 8 hours to remove all hazards and make the area safe. Other exceptions are where barricade tape may be used is where people are stationed outside the hazardous work area to help control accidental entrance into that area while performing short
duration work. Examples are where a crane lift is being performed or where a truck is being offloaded.

1)    Yellow/Black Barricade Tape

This type of barricade tape shall serve as a warning/caution to indicate to employees that a potential hazard exists. An employee may enter without permission from the contractor. This barricade tape shall be used for, but not limited to the following:

a) Identification of trip hazards, low hanging objects, etc.
b) Material storage on the site.

2) Red Barricade Tape

This type of barricade tape shall indicate "DANGER" and that potential serious hazard may be present. NO EMPLOYEE, other than that craft assigned to work inside a RED barricade may enter without first obtaining permission from that contractor. This barricade tape shall be used for, but not limited to the following:

a) Overhead work.
b) Live electrical components.
c) Scaffold under construction.
d) Around swing radius of equipment with a rotating superstructure.

2)    Magenta (Purple)/Yellow

This barricade tape shall be used to indicate "DANGER--RADIATION", and that
possible exposure may be present. This barricade tape is to be considered as an equal to red, in that, NO EMPLOYEES ARE ALLOWED to enter this area. This color is representative of X-Ray work being performed. Signs must also be posted to protect areas where radiation operations are in progress.

D.    BARRICADE ERECTION

Each supervisor/foreman or contractor performing work that requires barricades and tape to be erected shall:

1)    Erect the barrier and install the tape to enclose the specific area to be protected only. Do not block passageways or access ways unless entirely necessary. If passageways or crafts and/or possible alternatives.

2)    Erect barriers and install tape in a secure and neat manner that will maintain a height of between 1 meter and 1.2 meters (40" and 45") from the floor or ground surface. A second bar and strand of tape shall be placed half the distance between the top and the ground. The only employees allowed to enter a RED barricade area will be that craft assigned to tasks by that supervisor/foreman responsible for the work area and the barricade.


NOTE!!! The craft supervisor or craft person who erected the barricade and tape must remove the barricade and tape.

E.     INSPECTION


All barriers will be inspected daily by the Safety Manager and the responsible supervisor to ensure they are in a good state of repair. The supervisor shall repair all defects immediately.

SAFETY EXECUTION GUIDELINES


SAFETY EXECUTION

The control of accidents is the direct result of Management working together for a common objective – No Accident.

The leadership and tone for such an effort originate with Project Management and Contractor Management. The degree to which management accepts this responsibility will determine the success or failure of the entire Safety Program.

1. Orientation and Training

Instruction and training of employees are required. Apart from own orientation-training employees and will also attend training presented by Owner as required.

The following are mandatory training programs:

• Indoctrination / Orientation

All employees will attend a site-specific orientation presented by Owner prior to the start of work or as required by Owner when site conditions change such as when there is a change in the construction phase and/or during pre-commissioning and startup. The goals set for the project, the project safety rules and regulations and the No Accident philosophy will be communicated to all employees, supervisors, and managers. The course will also emphasize the importance of human life and promote employee ownership and accountability by utilizing behavior-based safety techniques.

• Supervisor Training

All supervisors will attend a special Safety Leadership Skill-path training course
presented by Owner that aims to equip supervisors with the knowledge and skills to fulfill their safety roles, duties and responsibilities.

• Safety Officers Training

All safety officers will attend a Safety Personnel Development course designed and presented by Owner. This course aims to equip the safety officers with the skills and knowledge to perform their duties. The course is similar to the supervisor training mentioned above but concentrates on the roles, duties, and responsibilities of safety officers. In addition, it includes safety administration and procedures and field execution safe work practices as per the project safety manual and procedures.

• Work Assignments

All work assignments shall include specific attention to safety. "Follow-up" monitoring is required in order to prevent accidents. (Safety Action Plan / Job Safety Analysis / Safety Task Assignments / Safe Work Plan / Permits).

• Meetings

Properly conducted and recorded weekly safety meetings will be required. Additionally, all meetings, staff, progress, and others will have a portion of the agenda devoted to accident prevention and a safety topic.

• Toolbox meeting

Toolbox meetings will be held daily by all supervisors as a coaching tool to help
modify the behavior of the employees to work safely, effectively assign permitted work and to constructively correct unsafe and to effectively acknowledge employees and crews for working safely.

• Specific Training

The Safety Procedures require that employees performing specific tasks or operating specific equipment be trained and certified or designated as a competent person as defined. The following training/certification programs will be presented as required and verified by Owner:
a) Equipment operators – specific to the type and or model of equipment operated.
b) Forklift operators – initial training specific to the model and annual refresher
training
c) Electrical Lock Out Tag Out
d) Working on or around energized electrical equipment/circuits
e) Confined spaces – Supervisor, Entrant, Attendee
f) Scaffold – Builder, User, Inspector
g) Trenching and Excavation – Competent Person
h) Fall Protection – Usage, Inspection, 100% fall protection and time-off policy.
All employees working at elevation must attend.
i) Respiratory Protection – Use, inspection, care
j) Hazard Communication
k) Personal Protective Equipment
l) First Aid – first aid, bleeding, CPR.
m) Fire prevention – firefighting, fire extinguisher, fire prevention.
n) Hot work – gas cylinders, burning, welding, cutting.
o) Crane and Rigging – crane operation, signals, rigging/slinging, lifting
equipment, lift permits.
p) Pre-commissioning and Startup.
q) Other – as required.

A database will be developed to track employee training. The database will identify type and date of certification / training each employee has received. ID Badges will be color-coded to indicate the training employees received.

Safety Action Plan / Job Safety Analysis

It is the responsibility of project supervision, including contractor/subcontractor supervision to perform a Safety Action Plan and Job Safety Analysis either individually or in a group, before any assigned task is undertaken. Supervisors shall complete the JSA form (Job Safety Analysis) identifying any hazards that may be associated with a task and the abatement measures required eliminating or protecting against the hazard. The JSA will be discussed during daily Toolbox
talks and may require actual demonstration of how to perform the task safely.

Supervisor Safety Logbook

Each field supervisor shall use the Supervisor Safety logbook weekly and record his safety duties performed. The logbook is designed to guide the field supervisor through his safety duties and responsibilities and to record the safety issues he needs the help of management.

Area Discrepancy Logbook

Each work area on site shall maintain an Area Discrepancy Logbook in which safety supervisors, management, superintendents and Owner log safety deficiencies. The area supervisor is responsible for correcting all safety deficiencies logged immediately and sign off on each entry.

Weekly Safety Area Assessments

The Weekly Safety Area Assessment program will be used to conduct and document project inspections and corrective action. The assessment team will consist of the Owner, contractor management, respective contractor superintendent, safety representative and respective supervisor. Scores will be tracked and reported on weekly bases to the Safety Department and
Owner Safety Department. These assessments play a fundamental role in the safety program and safety incentives. The minimum assessment compliance score is 85%.

Quarterly Safety Audits

Owner Safety Department will conduct quarterly safety assessments. As part of the assessment, a comparison will be made of the three months average of Weekly Area Safety Assessments conducted by the project team and the final score of the Quarterly Assessment. The Scores should be relatively close in comparison.

Corporate Safety Assessments

Corporate Safety Department will conduct a corporate safety assessment annually or as often as directed by Owner depending on the safety performance. As part of the assessment, a comparison will be made of previous safety assessments conducted and the final score of the Corporate Assessment. The Scores should be relatively close in comparison. The member of the Corporate Safety Department will arrange a meeting with project management and discuss his findings and
will make suggestions on corrections and improvement and submit a written report to project management and Owner Safety Department.


Safety Alignment

Safety alignment sessions are presentations and meetings hosted by Owner with Owner project management, contractor project management, other senior contractor employees and safety representatives. The alignment sessions will be held at the start of construction and after Owner has conducted a project-wide safety audit every four to six months or when the major project and/or
important milestone or transition points were reached. The purpose of the meeting is to discuss project wide and safety concerns and to identify areas for improvement and to determine, as a safety alignment team, ways of improving safety in the areas needing improvement including safety behavioral modification. All safety improvement strategies agreed upon during the safety
alignment session(s) must be implemented.

Recordkeeping and Accident Reporting

It is the Safety Manager’s responsibility to maintain all records. This includes the maintenance of an accident log, annual summary and the posting of all mandatory posters.

Records of the following safety activities must be maintained at the project;

• Employee training and certifications.
• Tool Box meetings.
• Weekly Safety Assessments.
• Weekly safety reports.
• Monthly safety reports.
• Safety Task Assignment forms by supervisor.
• Employee medical records.
• Mobil equipment inspections.
• Equipment, Assured Grounding, PPE, Rigging, Ladder inspections.
• Hazard Communication Program and Material Safety Data Sheet file.
• Accident and incident investigations – Employee’s Report – Supervisor’s Report.
• Disciplinary action.
• First aid log.
Injury Log specific to the project and current for the year.
• Other as required.
•Accident, Incident Investigations

All accidents, incidents, first aid cases and near misses must be investigated. Affected employee(s) will complete an Employee’s Report of Occupational Illness/Injury and the employee’s supervisor shall complete a Supervisor’s Report of Accident. Based on the severity i.e. OSHA Recordable or Lost Work Day or nature of the incident additional investigation may be warranted. Investigations of OSHA Recordable or Lost Workday cases shall include a “ Root
Cause Analysis” and measures that will be implemented to prevent similar incidents.

A project investigation team consisting of the construction manager, site safety representative and respective contractor superintendent and supervisor(s) shall jointly investigate accidents, incidents, near misses and first aid cases deemed serious of nature. Incidents serious of nature will be reported the same day within three hours of occurrence by phone to the Owner Safety Department and project management.

Language

The main language of the project will be English. All documentation will be in English and training will primarily be conducted in English. All levels of management, supervision, craft foremen, and safety personnel must be fluent in English to be accepted to work on the project. Translators will be employed to translate into all the other languages the workers employed to speak to assist in communication, instruction, training and toolbox talks. All documentation
translated into other languages shall be multilingual with English and the other language(s).

Safe Work Plan

All work performed on the project shall be according to and controlled by a daily Safe Work Plan which is an extension of the Job Safety Analysis. It shall be in accordance with the project safety rules and regulations and project safety procedures and specific to the type and scope of work and work area per supervisor. Area superintendents shall visit each work location at the
beginning of each work shift to check compliance to the planned work and the safety requirements thereof and sign the Safe Work Plan. The same is required towards the end of the shift.

Permits

Certain specific work requires a permit as per the project safety rules and regulations and project safety procedures. Examples of such specific permits are confined space entry, excavation, radiography work, lifting, etc. Such work must have a valid permit to perform the work.

 Medical

The medical facilities must be equipped to treat first aid cases and injuries requiring medical treatment where the hospital facilities are not required and also treat common illnesses. Owner’s medical facility shall be the main medical facility on the project setting the standards by leading the treatment, auditing all medical facilities and audit inspection of man camps.

A Saudi Government certified physician and nurse, and an ambulance driver trained in first aid will staff medical facility must staff the medical facility. The physician is liable and responsible for all medical decisions and treatment administered.

Security

The owner shall provide security at access points to the project in accordance with security rules and requirements. The site shall be secured with a fence with security controlled access gates. The site security procedure requires contractor a project ID badge for all employees working on the project, material entry/exit permits for material and vehicle passes for vehicles and buses transporting employees on site and equipment to access and egress the site.


Incentive

The incentive plan shall be in accordance with Owner’s Incentive Plan for the project.

ERGONOMICS GUIDELINES FOR CONSTRUCTION WORKERS



The least recognized aspect of ergonomics on the construction site is the fact that ergonomics, and safety and health, is profitable. Back injuries cost an average of $30,000 per case. The high incidence of these injuries in construction makes workers’ compensation a very costly part of staying in business. The aggressive prevention of these losses makes construction a much more profitable endeavor. Injuries and illnesses are the second largest cost in construction today. One-half of workers’ compensation costs in construction are musculoskeletal disorders. The frequency rate of back injuries for construction work is more than twice that of general industry. That means a substantial number of work-site injuries are a result of wear and tear on the body where the capabilities/limitations of the human body are exceeded or overexerted. Construction work requires and attracts workers with great strength, skill and agility.

However, while muscles can adapt and even grow, the joints, tendons, and
ligaments cannot. Recovery for the muscles is rather quick and uncomplicated. However, you can subject the joints and connecting tissues to permanent damage. These types of injuries too often disable and drastically shorten careers. This is a tragic result for the construction workers who rely heavily on their hands and back to perform their task.

Cumulative trauma disorders

Cumulative trauma is a term referring to the wear and tear on the musculoskeletal system.

Cumulative means that physical stresses add up gradually over a period of time and injury results from repeated stresses on a particular body part. Trauma means a bodily injury or insult.

Disorder means a physical ailment or abnormal condition. Therefore, the term cumulative trauma disorders (CTDs). Common CTDs include carpal tunnel syndrome in the wrist, tendinitis in the wrist, elbow, shoulder and other major joints, and even many back injuries.




Risk factors

Risk factors are an element of a job or a task that we know increase the probability of developing a CTD. The broad categories of occupational risk factors include:

• Repetitive motions;
• Awkward posture (positions);
• Forceful exertions;
• Mechanical pressures on soft tissues;
• Inadequate rest.

Other contributing factors include adverse environmental conditions, such as cold, vibration and personal characteristics. Exposure to risk factors does not always result in CTDs. It is important to note we also are exposed to such risk factors off the job. The ability to recognize and evaluate these factors on the work site is important in avoiding and controlling them.

Ergonomics

Ergonomics is a safety science focused on preventing the overexertion and overuse of injuries that are a result of cumulative trauma to the musculoskeletal system.

Ergonomics attempts to achieve this by better fitting the task to the worker rather than forcing the worker to adapt to the work.

 A good ergonomics program systematically identifies and controls the risk factors
that we know contribute to cumulative trauma and overexertion. Ergonomics principles apply to hand tool use and selection, materials handling, workplace and workspace design, display of dials and gauges, placement of controls, handles and knobs, shift work and more.

Ergonomics has not had much influence in the construction industry to date. The arguments about changing workers, changing the environment, location, workstation, and other factors has kept ergonomics out of construction for far too long. The fundamental principles of ergonomics apply to any and every work situation imaginable.

Technology that can reduce if not eliminate many risk factors on the job site is now available and advancing every day. We have the technology and the knowledge to fully use ergonomics in construction to gain the same benefits realized by general industry. So what is the missing ingredient?

A contemporary safety management process that influences the organizational culture to value safety and health. In short, a safety culture. The introduction mentions the elements of the effective safety culture. Employment of ergonomic principles and necessary training can be optimally successful with a safety culture in place.

Ergonomics principles

The most effective means of controlling CTDs is to reduce, if not completely eliminate, a worker’s exposure to the known risk factors. Employers can accomplish this through engineering controls.

Engineering controls attempt to design the work, workpiece and/or work tool to minimize motions, postures, and forces that can damage and prematurely fatigue. Administrative controls, such as reducing a worker’s exposure to the risk factors, can complement engineering controls.

 General ergonomic principles include:

• Use stools and workbenches as work surface rather, than the ground, when possible;
• Keep frequently used tools within reach or in garment pockets;
• Adjust working heights and reaches that allow the worker to keep the elbows as close to the side of the body as possible;
• Extend reach with tool extensions, according to manufacturer’s recommendations, or minimize reach distances with proper placement of work surfaces like ladders, scaffolds, and platforms;
• Use jigs or fixtures to hold workpieces, parts or tools — this allows both hands to operate the tool (more strength and control) and relieves the free hand from serving as a clamp;
• If gloves are necessary for comfort, protection or cleanliness, select the proper size, material, and style.

Tools

Tools are often the machine part of the man-machine interface. Pay particular attention to the design, selection, condition and proper use of manual and powered tools. Principles for hand tools and general tool use include:

• Ensure the availability and accessibility of the right tools and in working condition to do the
job;
• Establish systematic preventive maintenance for all tools and equipment;
• Repair or replace defective tools;
• Bend the tool, not the wrist — use ergonomically designed tools;
• Look for anti-vibration technology in air hammers and chisels;
• Use mobile equipment for material breaking or cutting rather than hand-held equipment;
• Use powered instead of manual tools or equipment when work requires high forces or repetition;
• Choose tools with the torque and speed to match the task — avoid overkill;
• Handle length should span the full width of the hand (gloved hand) or 4-inch minimum;
• Hand grips should be non-conductive, textured to avoid slip or twist, and without contour or finger grooves.

Materials handling

It is important to recognize that materials handling is often one of the largest cost components of a product or operation. Unnecessary handling of materials costs time and money. More importantly, unnecessary handling exposes workers
to risk factors. General principles for materials handling include:


• Storing supplies and materials between knee and shoulder height to avoid excessive reaching and bending;
• Using the lifting equipment available on-site to hold and position loads for work;
• Improving housekeeping to avoid complicating materials handling, thus making daily cleanup part of the job;
• Scheduling and laying out materials for ease of use rather than ease of delivery to reduce repetition and duration of exposure to risk factors;
• Deliberate pre-planning for materials (Just-In-Time);
• Planning deliveries, including the size of load, its position, location, and timing;
• Training workers in the identification of ergonomic hazards and material-handling strategies.

General advice

Safety and health professionals recognize it is crucial to managing safety and health just like any other priority on the job site. Owners, contractors and work leaders have a responsibility to communicate expectations and enforce safe work practices. The following tips should help:

• Never overlook employee participation in problem-solving;
• Back problems are not just lifting and postural problems — pay attention to slip, trip and fall hazards;
• Educate supervisors and foremen about where losses occur; painters think ladders are relatively safe, while that is the greatest injury agent for their industry;
• Noise, vibration, and impact affect equilibrium; therefore, falls also are ergonomic concerns. Owners can require construction safety planning
to establish an operational philosophy. Owners need to:
• Add safety performance into bid criteria for awarding contracts;
• Develop site-specific safety plans, including job safety analysis and phased safety programs;
• Encourage safety networking with contractors and labor, including a complaint log;
• Maintain safety statistics — when a spike occurs in frequency, then a recovery plan is required;
• Push for worker training and certification in apprenticeship programs;
 • Pay serious attention to proper medical management of an injury;
• Promote joint labor/management safety committee on large jobs.

New technological trends

Many specific technological advances have been made in ergonomics for construction, but there is still no magic bullet. The key remains to build
in safety and health technologies, and strategies, not add them as an afterthought. Here are recent innovations used here and abroad:

• A pogo-stick looking device ties re-bar in concrete work without bending, cutting or twisting wire;
• Machinery that lays heavy block in Sweden;
• Battery powered screwdrivers that replace manual and electric versions;
• Torque screw heads that require 40-percent less push force than Philips;
• Garments that include knee pad pockets, tool holsters, neck air cushions, integrated fall arrest harness;
• A disk attachment to handles for extension poles while working overhead to reduce grip forces;
• Eyewear with a bifocal feature on the top of the lens for overhead work;
• An extension handle for a floor-spreading trowel that improves posture and
productivity;
• Auto feed screws for power drills;
• A handle extension for power drills to allow worker to stand while fastening floors;
• A block with a handhold in the center designed to fit the hand;
• A redesign of packaging (50 versus 90-pound bags of concrete) for the convenience of the user rather than the manufacturer;
• Improved cab design for better vision, operation, and comfort;
• Truck design for tool storage and accessibility versus pickup truck method;
• Vehicle seats designed to reduce whole body vibration;

• Easier erecting scaffolds with sprockets that don’t weld the frames.

HELICOPTER SAFETY GUIDELINES

HELICOPTER SAFETY




Guidelines:

The helicopter is normally very safe but must be approached with caution.

Areas around a helicopter that present a hazard are indicated in the picture to
the right in bold font.

Operating areas should be kept clear of all personnel, cargo, hazardous
articles, personal belongings, and materials, tools that may be blown around the rotor downdraft while the helicopter is approaching or leaving the landing area (helipad).

Approach and leave the helicopter in a crouched position and always within
view of the pilot. Never towards the rear of the helicopter.

On uneven ground, always approach and leave on the downhill side. Never
on the uphill side.

All equipment such as tools, materials, etc, must be carried horizontally below waist level. Never upright or over the shoulder.

Any loose articles of clothing (scarves, caps, hard hats, goggles, mitts, etc.) must be
properly secured before approaching or leaving the helicopter.

Always keep a tight grip on loose articles.

Fasten seatbelt and keep fastened at all times until pilot signals the belt maybe
undone.

PFDs should be worn when operating over water.

Smoking is forbidden in or near the machine when it is on the ground.

Do not slam helicopter doors.

Cargo should be loaded and unloaded carefully and not thrown, dropped or jammed
in the cabin. Hazardous cargo may only be loaded in accordance with regulations.

The pilot is responsible for how the cargo weight is distributed. Make sure the pilot
knows the true weight of the cargo. Don’t guess/

Make sure cargo loads are secure before departing. Never leave loose articles or
ropes on cargo racks.
When using cargo locker, ensure you the correct door that it is properly closed
again with nothing hanging out. Always let the pilot know what weight is in the
locker and whether it is heavy.



Never throw anything around a helicopter.

The clear area to ground level within 15 meters of landing pad to give main and tail rotor
adequate clearance. The pad should be 4 meters square and be level and firm. If landing area is soft, use poles or tree trunks under skids. Poles must be secured so they cannot move. Snow pads must have contrasting markers to provide the pilot with a positive visual reference.
Landing area’s wind direction indicators should be clearly visible at all times.

Ensure the landing area’s approach and departure paths are within the capabilities of the helicopter for allowing for aircraft weight, altitude, temperature, and wind.

When directing helicopter to land, stand at the edge of a cleared area with back to the wind. Stay within the pilot’s vision at all times.

Ensure sufficient area cleared for main and tail rotor. See photo to the right for the helicopter’s blind area.

Wear high-visibility personal protective equipment and secured hard hat so you are easily seen when the helicopter is landing.

Slinging: when slinging ensure load is properly secured in net or sling. Ensure aircraft hook is properly closed/latched. Ensure pilot knows the true weight of the load.

When rigging sling loads, always wear high visibility vest, hard hat with chin
strap, safety goggles, gloves and hearing protection.

Keep clear of sling load at all times. Never turn your back to the load once the
helicopter is hooked up. Do not stand under sling load when the helicopter is
arriving/departing.

Discuss emergency procedures with the pilot before slinging loads.

If forced down with a helicopter, stay with the aircraft unless you know you can
reach help before an air search finds you. Be prepared to attract search aircraft

using flares, smoke, signal mirrors, or other available means.

WELFARE FACILITIES FOR WORKERS

 Welfare facilities  Why welfare facilities?  Work in the construction industry is arduous; it involves much manual or physical activ...